PHASE 2 PROJECT PHOTOS – CONSTRUCTION PHOTOS

Poured concrete at Elev. 1,2,3 2nd Floor Facing South-West (800x600).jpg Pouring concrete at Elev. 4-Stair -2 2nd Floor Facing South (800x600).jpg Pouring concrete at Elev. 4-Stair -2 2nd Floor Facing West (800x600).jpg Pouring Concrete at footings Elev. 7-Stair -4,5 Facing South-East (800x600).jpg Rebar footings at Elev. 7-Stair -4,5 Facing North (800x600).jpg Waterproofing foundation walls at Elev. 1,2,3 Facing East (800x600).jpg
Previous pageNext page Rebar footings at Elev. 7-Stair -4,5 Facing North (800x600)
Rebar footings at Elev. 7-Stair -4,5 Facing North (800x600)